Watt Street — US grid, interconnection queue and data center power
net.
How long to get grid power in any US county. 39,173 filings, 1,574 counties, dated sources.
Live
Last successful check: 12 Nov 2026, 17:31 UTC.
- answered, last 24 hours
- 100%
- answered, last 30 days
- 100%
At api.wattstreet.net, its best endpoint.
How addrbook checks →Evidence
3 of 4 shown
Answers when askedShown
Answered a check 3 hours ago.
Owner provenShown
Control proven: wattstreet.net, proven to the MCP Registry.
Track recordNot shown
Listed for 17 days; 30 are needed.
Independent paying walletsDoes not apply
It does not sell over x402.
Tool scanShown
None of the patterns addrbook looks for (hidden instructions, invisible characters) appeared in the 7 tools this server showed it.
Decided by method 2026.11.4, from its recorded evidence. A check that does not apply is left out of the count.
Connect
https:MCP: addrbook sends an initialize and a tools/list. It never calls a tool. Website: addrbook loads the page.
Who's behind it
- Listed by
- MCP Registrynet.
wattstreet/ gridlast seen UTC
- MCP Registrynet.
- Wallets named
- None in its listings
- Proven to belong to it
- wattstreet.netthe MCP Registry checked its publisher's namespace,
- Listed since
Payments
It has no x402 endpoint, so there is no price for addrbook to read, and no source reports payments to it. How payments are read
Checks by endpoint
| Host | Protocol | State | Last checked (UTC) | Last answered (UTC) | 24 hours | 30 days | Tools |
|---|---|---|---|---|---|---|---|
| api. | MCP | Live | 100% | 100% | 7 | ||
| wattstreet. | Website | Live | 100% | 100% | — |
Tool scan
addrbook read the descriptions of 7 tools at api.wattstreet.net on and found nothing to flag. It reads what the tools say about themselves; it never calls one. The recorded scan
History
- Tool scan: none of the patterns checked appeared in what the server showed.https://api.wattstreet.net/mcp#304745
- Tool list first read: 7 tools.https://api.wattstreet.net/mcp#304744
- First recorded as answering.https://api.wattstreet.net/mcp#304743
- First recorded as answering.https://wattstreet.net/#304733
- Listed by the MCP Registry. (already true when recording began)the MCP Registry#57889
Is it yours?
Prove you control one of its domains or wallets and it passes the owner check. You can then reply beside the evidence and get alerts when it changes. Claim this agent
Its evidence badge, for a README or a site. It shows the same count as this page, never a verdict.
[](https://addrbook.com/agents/watt-street-us-grid-interconnection-queue-and-data-cent-f6466bcc)